Gossen Metrawatt U1387-V011 5A three-phase transformer-operated
Gossen Metrawatt U1387-V011 5A three-phase transformer-operated electricity meter www.KupCoChcesz.pl
Gossen Metrawatt U1387-V011 5A three-phase transformer-operated electricity meter.
An energy meter designed for 3-wire networks with a current of 1(6) A and 5(6) A, operating at a voltage of 3 x 100 V, 1 (6) A, S0, CT VT with programmable pulses and compliant with the MID standard.
The calibrated energy meter is excellent for recording and billing consumed active energy in various fields such as industry, households, commerce or building technology. Data is transmitted to acquisition, invoicing and optimization systems, as well as to building automation and control applications, via pulse outputs, LON, M-Bus or L interfaces. Thanks to the fast error detection function during installation, mounting the meter is extremely simple. In addition, thanks to information on the current load power, the user always has full control over energy consumption.
Note! The product description has been translated automatically. If it needs correcting, please contact us.
Special features:
Professional energy meter designed for 3-wire networks (3 x 100 V) with a current of 1 A, 5 A and the option to connect a converter.
Accuracy class suitable for industrial and commercial applications, and also meeting higher requirements in households.
Cost savings thanks to initial verification in accordance with the MID standard, conformity assessment module B + D.
Display of installation errors: rotating field direction, phase failure, converter polarity reversal, overload.
Universal pulse output with programmable pulses, pulse duration and selection of the CT VT voltage range.
Full functionality in the event of a power failure thanks to a failure-resistant 24V auxiliary voltage.
Sealable cover, parameterized lock.
Product made in Germany.
Features:
3-phase meter with 3 wires.
Operating voltage: 3 x 400 V.
MID certificate: Yes.
DIN rail mount version.
Designed for three-phase electricity meters with the option to connect a 5 (6) A and 1 (6) A converter.
Display: LCD.
Pulse output: S0, programmable pulses.
CT VT: Programmable.
Bus interface: M.
Width: 126 mm.
Height: 45 mm.
Frequency: 50 Hz.
Type: U1387-V011.
Specifications:
Product type: Three-phase transformer-operated electricity meter.
Weight: 421 g.
Height: 90 mm.
Length: 125.5 mm.
Width: 70 mm.
Display type: Digital.
Maximum load current (electricity meter): 5 A.
Type (manufacturer's type): U1387-V011.
MID certificate: Yes.
Color: White.
Package includes:
1 x Gossen Metrawatt U1387-V011 5A three-phase transformer-operated electricity meter.
Used product.
Product checked and tested, fully functional, practically like new.
No original packaging.
No user manual.
Product reviews
Ask a question
We will send the answer to your e-mail address.












Own this product?
Rate Gossen Metrawatt U1387-V011 5A three-phase transformer-operated electricity meter and help others choose.
Add a reviewCustomer reviews (0)
This product has no reviews yet — yours could be the first.
Add a review
Sign your name and write a few sentences about the product.